BriefK1
Locked
Foreman View

Safety Gate

Excavation Prep · Zone A

Zone A construction site
This work is locked until the site is cleared to proceed.
K1 won't unblock the task until every required check is signed off. Take it serious. Skip nothing.
Required checks
0 / 7
Captured for evidence

Each item gets time-stamped, geo-tagged, and dropped into the Evidence Vault. If a claim comes in 18 months from now, this is the crystal-clear record.

9:41
K1 Demo · Resize browser below 480px to view full-screen